INSTALLATION OF 4000KVA TRANSFORMER AT THE YUNZU FIBRE FACTORY

image

Project Overview

Installation and commissioning of 4000KVA Transformer with busbars connected to the control panels and installation of control panel with busbars arrangements

Project Details

  • Project Employer: ELECTRICITY COMPANY OF GHAN (ECG)
  • Contractor: CK ENGINEERING LTD
  • Subcontracted by: TIMELINE SOLUTIONS ENGINEERING LTD
  • Subcontractor : GROSS POOL ENGINEERING LTD
  • Duration: December, 2022 – April, 2023
  • Project Status
    Completed, April, 2023
  • Type
    Electricity Construction
  • Location
    Nsawam – Aburi Road, Eastern Region, Accra - Ghana
  • Electricity Poles
    Concrete Pole Overhead line
  • Project Details
    Construction of 12KM/33KV Spun Concrete Pole Overhead line